Machine setup · VERSION 0.2.0

First physical-machine commissioning

Qualify the actual installation before normal production controls.

Step by step

  1. Open Diagnostics and inspect the commissioning record and the current machine identity.
  2. Work through the supervised stages in order: no motion, manual motion, spindle, probe, tool setter, air run, real cut, tool change and recovery.
  3. Use the machine-specific checklist and reference programmes supplied with the accepted build. Record genuinely unavailable capabilities through the offered workflow.
  4. Review and explicitly complete each stage only after its physical checks pass. Simulated evidence is labelled separately.
  5. For later connections to a commissioned machine, use Machine Control's normal setup and homing route.